NetApp
Data Protection : SnapVault : Managing SnapVault relationships : Editing SnapVault schedules

Editing SnapVault schedules
You can edit a SnapVault schedule on a volume from the Edit Schedule dialog box, to modify configuration settings such as type of schedule and the schedule time line.
Steps 
1.
From the home page, double-click the appropriate storage system.
2.
In the navigation pane, click Data Protection > SnapVault.
3.
Click the Schedules tab.
4.
Select the SnapVault schedule that you want to edit from the list of SnapVault schedules and click Edit.
The Edit Schedule dialog box is displayed.
5.
In the General tab, modify the schedule details and the schedule type.
6.
In the Snapshot Retention tab, modify the maximum Snapshot copies to retain, attempts to create Snapshot copies, warning count, whether old snapshot copies should be preserved, and the SnapLock retention period as available.
7.
Click Save and Close to save your changes and close the dialog box.
Result 
The properties of the SnapVault schedule are modified.


Was this topic helpful? Send comments to NetApp.